Case studies

Case Study

Savoy Hotel Refurbishment, London

DGA were commissioned by the main contractor on the £100m prestigious refurbishment project, to prepare a fully logic linked programme including procurement and 'information required' interfaces to quantify and rationalise extension of time scenarios as required.

20 Jan 2017